Skip to content
ASE Construction ClosureApril 4, 2027 · 11:00 PMNovember 19, 2027 · 7:00 PM · No commercial or general aviation operations
Learn what this means →

Aviation Operations

General Aviation & Pilot Resources

Operational guidelines, mountain flying considerations, FBO services, and noise abatement rules for pilots operating at Aspen/Pitkin County Airport (ASE).

Aspen/Pitkin County Airport Airfield & FBO Ramp

Atlantic Aviation FBO Ramp & Runway 15/33 Approach

Fixed-Base Operator

Atlantic Aviation ASE

Full-service FBO providing Jet-A (with Sustainable Aviation Fuel SAF blend options), 100LL, heated hangar storage, eGSE ground power, Type I/IV deicing, and crew lounge. Unicom 122.95 · Phone: 970-920-2016.

Curfew Rules

10:30 PM – 7:00 AM Curfew

Strict voluntary curfew. No engine starts or departures allowed between 2230L and 0700L. Emergency medical evacuations exempt. Violations logged and reported to Pitkin County Commissioners.

Airfield Data

7,838 ft Elevation

Runway 15/33 (7,006 ft x 100 ft asphalt). High density altitude operations in summer require precise gross weight and climb gradient calculations over mountain terrain.

FAA Instrument Approaches & Special Procedures

LOC DME-E & RNAV (RNP) Approaches

ASE features steep 3.5-degree to 4.3-degree glidepaths due to surrounding 14,000 ft mountain peaks. Special Aircrew & Aircraft Authorization (SAAAR/AR) required for RNP Z 15 approach.

Sardy Departure & Noise Abatement

All departing turbine aircraft must follow Sardy Departure procedures, maintaining maximum climb performance to diminish noise over West Aspen residential areas.

ASE FBO & Frequency Directory

ASE Tower / CTAF118.85 MHz
Ground Control121.90 MHz
ATIS Weather120.40 MHz
Atlantic Aviation Unicom122.95 MHz